thumperclone wrote on 01/26/25 at 17:32:01:NOT FACTUAL they both have pay back
Please tell all of us,
What is the cost :
To take down Windmill blades ?
To cut them up to size to transport on the road ?
To dig a HUDGE hole in the ground to place them ?,
(Because they can NOT BE RECYCLED)Why in the, ‘windmill farms’, 40 to 50 % are NOT Moving ?
Why, 10% are BLACK from fire “
How many GALLONS of oil it takes to run them ?
Where does that OIL come from ?
What is the cost to remove photovoltaic panels ?
(Which are classed as, “ hazardous waste”, MATERIAL ?)“If a solar panel will be disposed, the generator must make a hazardous waste determination and, if the panel is hazardous, it must be managed under the hazardous waste requirements in 40 CFR Parts 262 through 268.’
“solar panels are not covered by the shredded circuit board exclusion to the definition of solid waste’
“shredded and put into a product that is placed on the land) would be considered a solid waste,’And on and on and on and on.All of the,
still Experimental, solar/wind creation of elect,
Is
STILL NOT, a viable option,
Perhaps someday it will be,
BUT NOT TODAY !!!!!!!